Take a look at our low cost Concrete Screed.  Perfect for small projects where a screed is required. 307-745-9488
screed
Concrete Tools
Trade Tool Innovations, LLC (307) 745-9488
 

 

Gas Powered,
Vibrating,
Walking,
Concrete
Screed

 

 

Pictures:

Completed slab:

Total time start to finish, approximately 2.5 hours. Although concrete was laid down in approximately 45 minutes.

Drier concrete mixtures are much stronger and are less prone to shrinkage.

Slab is ready for foot traffic in 24 hours, although auto traffic should be delayed for approximately for 72 hours minimum.

 
home · screed pricing · screed pictures · screed FAQ · about us · contact · affiliates · sitemap